PROJECT

The 378,000 sq ft building will provide HMRC and NHS Digital with a modern and collaborative workspace to use as their new regional centre.

Wellington Place is a prestigious new urban quarter and business location of choice for leading corporate organisations, located at the heart of Leeds city centre.

7 and 8 Wellington Place, two grade A office buildings, will become the latest regional Government Hub for a number of departments, including HMRC and NHS Digital and will provide civil servants with a high-quality working environment including facilities for social interaction, well-being, cycle storage and showers.

 

SOLUTION

On behalf of Wates Construction Ltd, Daikin Applied UK were appointed to provide 4 x Platinum efficiency EWAD-TZ-B air cooled chillers. The TZ range offers top class performances in energy efficiency, achieving an ESEER rating of 5.78.

The EWAD-TZ-B features optimised inverter screw compressors and inverter fans to achieve highest efficiency levels at full and partial loads – chosen to help 7-8 Wellington Place achieve a BREEAM rating of excellent.

Daikin Applied also supplied 6 x D-AHU Professional, supplied and installed including site bolt-up and leak check.

“Daikin provided brilliant technical support throughout the design phase and this was further supported with on time delivery to meet a tight programme, high quality install and trouble-free commissioning”.
(Matt Bell, Assistant Project Engineer at Wates Group)

 

PRODUCT

6 x D-AHU Professional

4 x Platinum EWAD-TZ-B

Cooling capacity: 3,080 kW